Guilin Mining Machinery Co., LTD.

GK2150 Pendulum Grinding Mill

  • /uploads/image/20180427/18/gk2150-pendulum-grinding-mill-1_1524825578.jpg
  • /uploads/image/20180427/18/gk2150-pendulum-grinding-mill-2.jpg
  • /uploads/image/20180427/18/gk2150-pendulum-grinding-mill-3.jpg
Similar products
  • GK1620A Pendulum Grinding Mill

    GK1620A Modified Grinding Mill, high output and low consumption, is specially designed by our technicians according to market development demand. This is medial type between 5R and 6R.1.High Output--W...

  • GK1720A Pendulum Grinding Mill

    GK1720A Grinding Mill is designed by our technicians based on GK1720 mill.This is a large type mill with optimized design.1.Optimized shock-absorption design for the main unit, reduce vibration when t...

  • 5R4128 Pendulum Grinding Mill

    Technical & Structural Benefits of 5R4128 Pendulum Grinding Mill1.Strong ability of shoveling material: Adopting super large shovel blade to shovel material as much as possible to be ground into t...

Technical & Structural Benefits of GK2150 Pendulum Grinding Mill:

  • This model has high output, high efficiency, and energy saving. It has small floor area and saves workshop.
  • The innovative design of the "maintenance-free device" for roller assembly, Refill grease every 30 days.
  • Large conveying capacity: Blower adopts high-pressure centrifugal fan to increase air volume and air pressure, so as to greatly improve the ability of pneumatic conveying. 
  • Optimize inside design of the main unit, keep the roller and grinding ring abutting contact during running, improve grinding efficiency and operational reliability, and reduce the high failure rate of vertical pendulum grinding mill.
  • Equipped with water cooling structure for reducer of the main unit. Reducer adopts German technology.
  • High classifying accuracy: Classifier adopts built-in large taper blade turbine classifier. 
  • No need to disassemble the spare parts such as cinquefoil shelf. More convenient for maintenance.
  • Energy-conservation & Environment-protection: Equipped with pulse dust collector in surplus wind outlet, collection efficiency is as high as 99.9% to keep workshop environmental health.
  • Automatic control for air blower valve, reduce operating labor intensity.
  • Integral installation of air blower, water cooling system ensures running efficiency.
  • Running more smoothly, low noise, energy saving.
  • Intelligent control. The one button start and stop system and fault alarm system reduce operating personnel.

Model

Max Feeding Size

Product Fineness

Capacity

Gross Weight

Total Installed Power

GK2500

≤35mm

80-325mesh

15000-50000kg/h

66t

625kw

GK2150

≤35mm

80-325mesh

10000-40000kg/h

64t

548kw

GK1720A

≤35mm

80-325mesh

6000-25000kg/h

49t

424.5kw

GK1620A

≤30mm

80-325mesh

3000-18000kg/h

34.5t

329.5kw

GK1500

≤20mm

80-325mesh

2500-16000kg/h

31t

242kw

5R4128

≤20mm

80-325mesh

2000-14000kg/h

28.5t

220kw

5R4125

≤20mm

80-325mesh

2000-14000kg/h

28.5

202kw

GK1280

≤20mm

80-325mesh

1500-10000kg/h

19t

133.5kw

4R3220

≤20mm

80-325mesh

1000-7000kg/h

14.6t

101.5kw

Hoisting and Installation of GK2150 Pendulum Grinding Mill:

1. Hoisting
The mill should be hoisted along with the packing frame. The wire rope can be threaded through the gate and feed opening after the packing frame is removed and then mill is hoisted. Be careful not to do damage to vulnerable components during hoisting. Don't let the semi-coupling at the lower and touch the ground and have a stress either. The separator is hoisted by a wire rope which goes through the hoisting hole. Put some soft material between wire rope and the machine during hoisting. Don't do damage to the fragile parts of the machine, protecting the machine from toppling while hoisting.

2. Installation
  • Line: Carefully line for foundation according to foundation drawing.
  • Dig:  Make sure the height of host position (4000x4000) is not less than 3000 mm. The other height can be adjusted according to the actual situation.
  • Mark height and place mold: After finishing digging, mark corresponding height position: host maintenance bottom, host foundation bolt, reducer base bolt, height line for air blower bearing base bolt, host, air blower base, reducer base.
  • Place rebar: Place rebars at the host foundation bolt holes. The actual ground condition will determine if the other bolt holes need to be placed rebars.
  • Pouring concrete: Cement strength must be above 42.5. Place mold when concrete pouring to marked height. Make sure the mold not to move during pouring.Keep pouring and vibrate continually with vibration rod to ensure quality once the mold in the correct position.Heating measures are necessary for the freezing season and 14 days is basic maintenance period.
  • Host installation: The host central axis possibly moves up.The sign for the axis up is the gap for the host coupling upper end and gland is less than 17 mm.Then you must use hammer knock top center of star rack to reset the central axis.Calibrate host base with shim plate.Correct level with frame level. Host lateral and longitudinal levelness should be less than 0.1mm within 1000 mm distance.To host return-air box mouth cavity as the benchmark, calibrate blower shell(fixed with t-branch pipe) and blower base.Then we can do the second concrete pouring. As long as the concrete nears to lower surface of host base, place concave type 250x250 steel plate with different thickness on the foundation bolts, then fill fully with slurry.After 18 days basic maintenance period the mill can work.
  • Separator and duct installation: Make and arrange support frames of separator and cyclone collector according to GK2150 Assembly Diagram. The inclined strut can be added moderately to different frame strength.Place separator and cyclone collector onto the frames and connect all ducts.

Leave a Message Email Us

we will contact you within 24 hours.